The difference a foot makes: Raising the seawall

Investigating what a 12-inch seawall extension might look like from Lakeshore Drive

MANDEVILLE — A controversial $2 million plan to raise the Lake Pontchartrain seawall by a foot was presented to the public on Sept. 8, 2019, by Principal Engineering and then-Mayor Donald Villere. A recently proposed task order before the City Council on July 8, 2021, could have opened the door, some say, to the revival of this project, but that task order was pulled from consideration by the council.

Here is a video made by Mandeville Daily showing what a 12-inch addition to the top of the seawall might look like from the Lakeshore Drive road surface. Judge for yourself if such a project would have a significant impact on how the lakefront experience would or wouldn’t be altered.

Watch the video: Raising the Seawall to see what raising the seawall 12 inches might look like.


RELATED STORY: Recent task order could have opened door to old proposal to raise seawall


-30-

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s